Skip to main content

Plumbing work in Yerevan

Plumbing work in Yerevan for apartments, houses and business spaces as part of a renovation, from planning to installation and testing.

We carry out this work as part of a complete apartment renovation.

Explore the service
Water supply and drainage before bathroom finishing

Plumbing work · Yerevan

Plumbing solutions

We agree the work after reviewing the layout, existing pipes and the fixtures or appliances to be installed.

  • Water supply connections

  • Drainage pipe routes

  • Connections for bathroom fixtures

  • Kitchen sink and appliance connections

  • Assessment of existing pipes and fittings

  • Testing the installed system

Water connections and drain beneath a basin

Plumbing work · Yerevan

Service overview

Plumbing is best planned early, before final wall and floor finishes.

We plan pipe routes and connection locations around the kitchen and bathroom layout, including appliances and fitted furniture.

Why layout comes first

Moving appliances or fixtures after decorating can mean moving pipes and opening finished surfaces. Agreeing their positions early helps avoid this extra work.

What to agree before installing pipework

Plumbing points need to suit the planned equipment and the existing system.

  • Mark fixtures, kitchen appliances and furniture to establish water supply and drainage locations.

  • Assess relocated connections and replacement of old components against technical conditions, not the preferred layout alone.

  • Agree service installation before wall and floor finishes and include checking the installed system in the work scope.

Work stages — from the first call to handover

At every stage, you know what we do, what you confirm, and what happens next.

  1. Initial consultation

    We clarify your brief and property type, then propose the next practical step.

  2. Property survey and measurements

    We inspect the property or site, take measurements, and collect the data needed for an estimate.

  3. Preparing solutions and an estimate

    We prepare the solutions, work stages, and initial estimate for your approval.

  4. Signing the contract

    We record the agreed scope, terms, and procedure for changes.

  5. Delivery and control of the work

    We organise and control the work in the agreed sequence.

  6. Inspection and handover

    We inspect the completed work with you, finish agreed adjustments, and hand over the property.

Why SHINEX

Price fixed in the contract

The amount changes only if you change the scope of work, and only in writing.

  1. Detailed estimate

    Before the contract is signed, we show you the list of works, quantities and prices.

  2. Staged payments, no advance

    You pay for what has already been done.

  3. 12-month warranty

    On all work we have carried out.

SHINEX

Cost factors

The number of plumbing connections, pipe routes, system condition, demolition and selected equipment affect the cost.

Discuss your renovation

Contact SHINEX and tell us what you would like to renovate. We will discuss the property condition, the work you need and the next steps for a site visit and estimate.

SHINEX / FAQ

Frequently asked questions

When is plumbing done?

Pipework is usually installed during the early renovation stages, before walls and floors receive their final finishes.

Can kitchen or bathroom connections be moved?

That depends on the existing system and technical conditions.

Can I request plumbing work on its own?

We only carry out complete renovations. Plumbing is done as part of that, by one team.

SHINEX

Planning renovation or construction?

Send the key project details and we will identify the right next step: an estimate or a site survey.