Skip to main content

House construction in Yerevan and across Armenia

We build private homes from site and design review through foundations, main structure, roofing, building services, and finishes.

Request a cost estimate
Two-story house under construction

Main services

What to establish before building

A construction discussion starts with the site, design and intended level of completion.

  • Clarify whether a design is ready or the home's requirements and drawing set still need defining.

  • Prepare the approximate floor area, number of storeys and available site information.

  • Define the intended completion stage: structure, building services and finishes need separate scope decisions.

Walls and structure of a house under construction

Main services

Service overview

We organise and control each stage of a home build in Yerevan and across Armenia, from the agreed design to inspection and handover. The scope and cost depend on the site, design, and intended level of work and finishes.

What the service includes

  • Site and design review
  • Preparation and structural work
  • Building-services solutions and finishes

Who it is for

  • Landowners planning a private home

When this service is suitable

  • A site and design are available
  • A site is available while the design is being clarified
  • The next construction stage needs an assessment

Work stages

  1. Site and design review

  2. Preparation

  3. Foundation and structure

  4. Walls and roof

  5. Building services

  6. Finishes

  7. Inspection and handover

Foundation slab prepared for concrete
Foundation slab prepared for concrete
Walls and structure of a house under construction
Walls and structure of a house under construction
Roof junction, gutter and stone facade
Roof junction, gutter and stone facade
Stone facade installation
Stone facade installation
Stone house facade, pitched roof and gutters
Stone house facade, pitched roof and gutters

Why SHINEX

Price fixed in the contract

The amount changes only if you change the scope of work, and only in writing.

  1. Detailed estimate

    Before the contract is signed, we show you the list of works, quantities and prices.

  2. Staged payments, no advance

    You pay for what has already been done.

  3. 12-month warranty

    On all work we have carried out.

SHINEX

What affects the cost

  • Area and number of floors
  • Site conditions
  • Structural and building-services solutions
  • Level of work and finishes
  • Property location and travel arrangements

For an initial assessment

  • Approximate house area
  • Available site and design information
  • Planned level of completion

SHINEX / FAQ

Frequently asked questions

Where do I start if I have land but no design?

Gather the site information and the approximate size of the home you want. First establish the design requirements and required drawings, then assess the construction stages.

Can construction be split into stages?

The design and construction sequence determine the stages. We discuss where each stage should end and what will be required before work can continue.

What does a complete home build include?

The scope may cover site preparation, foundations, structure, walls, roofing, building services and finishes. Design work, materials and the intended level of completion must be specified in the project scope.

SHINEX

Planning renovation or construction?

Send the key project details and we will identify the right next step: an estimate or a site survey.