Skip to main content

Reinforced concrete construction

Reinforced-concrete structures delivered to approved project documentation.

Explore the service
Reinforced concrete frame and slab formwork

Main services

Preparing to discuss concrete construction

Floor area alone does not determine the quantity of reinforced concrete work.

  • Provide structural drawings to establish the geometry and work sequence.

  • An estimate needs quantities of concrete, reinforcement and formwork, not just the home's floor area.

  • Clarify the condition of the prepared base and equipment access so the discussion reflects site conditions.

Reinforcement and formwork for concrete construction

Main services

Service overview

We carry out reinforced concrete work according to the structural design, with attention to dimensions, construction sequence and the checks required at each stage.

What the service includes

  • Preparation and formwork
  • Reinforcement
  • Concrete placement and execution control

Who it is for

  • Private and commercial clients with an approved structural design

Work stages

  1. Design and base review

  2. Formwork and reinforcement

  3. Concrete placement

  4. Inspection and striking

Reinforcement and formwork for concrete construction
Reinforcement and formwork for concrete construction
Formwork installation
Formwork installation
Foundation slab prepared for concrete
Foundation slab prepared for concrete
Foundation concrete placement
Foundation concrete placement
Surveying instrument for geometry checks
Surveying instrument for geometry checks

Why SHINEX

Price fixed in the contract

The amount changes only if you change the scope of work, and only in writing.

  1. Detailed estimate

    Before the contract is signed, we show you the list of works, quantities and prices.

  2. Staged payments, no advance

    You pay for what has already been done.

  3. 12-month warranty

    On all work we have carried out.

SHINEX / FAQ

Frequently asked questions

Can concrete work be estimated from floor area alone?

An accurate estimate needs structural drawings and quantities for concrete, reinforcement and formwork. Buildings with the same floor area can require different structural quantities.

What should I provide to discuss the work?

Structural drawings, site information, the condition of the prepared base and equipment access. These help establish the scope and sequence.

SHINEX

Planning renovation or construction?

Send the key project details and we will identify the right next step: an estimate or a site survey.