New-build apartment renovation in Yerevan

Finish your new-build apartment with the wiring, plumbing, surface preparation and interior finishes planned before you move in.

Service illustration

We begin by checking what the developer has provided: walls, floors, openings and utility connections. This establishes the preparation and finishing work still needed.

Agree furniture, lighting and plumbing fixture positions early so the necessary connections can be planned before surfaces are finished.

What we check before work

Even a partly finished new build can need corrections. The survey establishes the preparation scope.

  • Wall, floor, and ceiling level.
  • Location and adequacy of electrical points.
  • Water, drainage, and plumbing outlets.
  • Openings, ventilation, and surface readiness for finishes.

New-build renovation stages

Plan concealed wiring and pipework before final finishes. The preparation sequence follows the design and the condition of the apartment.

  • Measurements, layout, and estimate.
  • Plastering, levelling, and screed where needed.
  • Electrical and plumbing installation.
  • Waterproofing, tiling, ceilings, flooring, and painting.
  • Doors, lighting, fixtures, and final inspection.

Timing and cost

Timing and budget depend on apartment readiness, area, number of service points, chosen materials, and complexity. A site survey is needed for a precise estimate.

Discuss your renovation

Contact SHINEX and tell us what you would like to renovate. We will discuss the property condition, the work you need and the next steps for a site visit and estimate.

Frequently asked questions

Does a new build need a screed?

That depends on the actual floor condition and selected finish. A floor check establishes whether local correction or a full screed is needed.

When should I commission interior design?

Preferably before building-services work: a layout and equipment plan help place electrical and plumbing points correctly.

What information should I request from the developer?

Ask what work has been completed at handover and what information is available about utility connections. Share any connection plans and handover documents with the apartment layout.