Electrical work in Yerevan
Electrical installation during renovation or construction: plan sockets and lighting, route cables and prepare connections for appliances.
We carry out this work as part of a complete apartment renovation.

Electrical work · Yerevan
Electrical work plan
The scope is agreed around the design, equipment and safety requirements.
Lighting for different rooms and activities
Socket and switch locations
Connections for major appliances
Workstation and network connections
Cable routes
Preparation for equipment connections

Electrical work · Yerevan
Service overview
Electrical planning starts with the furniture, appliances and activities in each room.
Before wall finishes are applied, we agree socket, switch and light positions and assess the power required by the equipment.
Why design affects electrics
Furniture, kitchen units and workstations determine where sockets, switches, lights and equipment connections will be needed.
Preparing an electrical layout
Connection planning starts with how the space, furniture and equipment will be used.
List appliances and mark work areas to discuss power requirements and connection locations.
Coordinate outlets, switches and lighting with furniture placement before walls are closed.
Agree replacement of the existing system and installation of chosen light fittings explicitly in the project scope.
Work stages — from the first call to handover
At every stage, you know what we do, what you confirm, and what happens next.
Initial consultation
We clarify your brief and property type, then propose the next practical step.
Property survey and measurements
We inspect the property or site, take measurements, and collect the data needed for an estimate.
Preparing solutions and an estimate
We prepare the solutions, work stages, and initial estimate for your approval.
Signing the contract
We record the agreed scope, terms, and procedure for changes.
Delivery and control of the work
We organise and control the work in the agreed sequence.
Inspection and handover
We inspect the completed work with you, finish agreed adjustments, and hand over the property.
Why SHINEX
Price fixed in the contract
The amount changes only if you change the scope of work, and only in writing.
Detailed estimate
Before the contract is signed, we show you the list of works, quantities and prices.
Staged payments, no advance
You pay for what has already been done.
12-month warranty
On all work we have carried out.
SHINEX
Estimate basis
Cost depends on the number of outlets and connections, route length, distribution board requirements, wall condition and complexity.
Discuss your renovation
Contact SHINEX and tell us what you would like to renovate. We will discuss the property condition, the work you need and the next steps for a site visit and estimate.
SHINEX / FAQ
Frequently asked questions
When should sockets and lighting be planned?
At the start of renovation, alongside the furniture and appliance plan.
Can an old electrical system be replaced?
The scope follows an assessment of the existing system and required capacity.
Does work include light installation?
The exact scope is agreed from the project and chosen equipment.
Related services
All related services
SHINEX
Planning renovation or construction?
Send the key project details and we will identify the right next step: an estimate or a site survey.
